CCR was selected to perform the demolition of the two Indian River Inlet Bridges. The structures were each 1,000 feet in length and due to large scour holes, located in the river bottom, conventional methods for demolition were deemed unsuitable.
CCR was selected to demolish the Saturn V Rocket Facility, commissioned by NASA to send America to the moon during the Apollo Missions. Work included abatement and demolition of over 20 structures including the Vertical Check Building which stood over 135 feet tall.
CCR was selected to perform the removal of the Denver Water main campus and to facilitate new construction. The project included 15 building removals, asphalt paving, contaminated soils and underground storage tanks as well as construction of retention ponds and rain gardens.